CASE STUDIES

The Tale of Two Ponds: Why stormbasix+ Over Other Automated Valves

Simplicity Wins Over Hillwood Development at Wolf Ranch in Georgetown Texas

stormbasix+ Vault Valve and Inlet Riser Screen was installed in phase seven of the Wolf Ranch Development as their Batch Detention system of choice. stormbasix+ was built for simplicity, and it has been this simplicity that is winning over developers and engineers throughout the Edwards Aquifer when they are looking for a batch detention solution to protect receiving waters from flooding and stormwater pollution.

From Bio to Batch: How smartbasix+ Transformed Stormwater Management at Velsa Ranch

A $200K Win for Engineers and Developers in Cedar Park’s Booming Retail Sector

Faced with strict stormwater regulations near the Edwards Aquifer, the Velsa Ranch Retail Center in Cedar Park, Texas, originally planned an expensive bioretention system. With the help of Kimley-Horn and stormbasix+, the team pivoted to a more cost-effective and easily maintained SmartPOND batch detention system, saving over $200,000 and reducing construction complexity. This shift delivered a smarter, simpler, and scalable solution without compromising on regulatory compliance.